SH 183 construction
SH 183 Home
DFW Freeways Home
Page last updated or reviewed: created April 18, 2016, last updated July 19, 2016
The first phase of construction of the expansion of SH 183 through Irving was underway in 2015.
Small Thumbnails
Large Thumbnails
Full Size
Click on individual images to expand and collapse thumbnails. Captions and photo dates are shown with full size images.
This is the new westbound bridge over the Trinity River. (Photo date: March 26, 2016)
This is on the west side of the levee at the Trinity River crossing, showing the structure for the new westbound main lanes. (Photo date: March 26, 2016)
High resolution This looks westbound at Regency Street, just west of the Trinity River. (Photo date: March 26, 2016)
High resolution This view looks northbound along Loop 12 from the SH 183 overpass. The piers on the left are for the toll/HOV lane connections. At the time of this photo, traffic connection from northbound Loop 12 to westbound SH 183 was using a detour on the Texas Plaza bridge in the distance. (Photo date: March 26, 2016)
High resolution This view looks north along Loop 12 from the Texas Plaza overpass, showing a large straddle bent for the HOV/toll lane connection. (Photo date: March 26, 2016)
This view looking south along Loop 12 from the Texas Plaza overpass shows piers for the HOV/toll connection ramp. SH 183 is in the distance. (Photo date: March 26, 2016)
Looking south, on the northwest side of the interchange. (Photo date: July 3, 2016)
High resolution The Stars and Stripes on display for the July 4 weekend, looking west. (Photo date: July 3, 2016)
High resolution (Photo date: July 3, 2016)
High resolution Looking north along Loop 12 (Photo date: July 3, 2016)