Page last updated or reviewed: Sept 23, 2022 (review)
These aerial views may be used by anyone for any purpose, including web and print.
Click on thumbnails to see larger image, additional image information, and additional image sizes available for viewing.
I-30 in Garland
Photo date: 4/16/2011.
2022 Status:
Modified
The freeway in the lower part of the photo, at the overpass in the foreground, was modified for the LBJ express project, under construction from 2021 to 2024.
I-30 at Lake Ray Hubbard
Photo date: 9/1/2008.
2022 Status:
Modified
Frontage roads were added to the bridge section in the lower part of the photo. Connections to Dalrock Road (on the peninsula) were rebuilt. Construction took place from 2021 to 2024.