Construction of Grand Prairie Frontage Roads
Bush Turnpike Home
DFW Freeways Home
Page last updated or reviewed: Sept 22, 2022 (update text)
The frontage roads are State Highway 161. The Bush Turnpike main lanes on this section opened October 15, 2012. The Bush Turnpike between I-30 and I-20 was expanded to eight main lanes in 2022.
Small Thumbnails
Large Thumbnails
Full Size
Click on individual images to expand and collapse thumbnails. Captions and photo dates are shown with full size images.
This is the southernmost section of 161 in south Grand Prarie. These photos show work underway on the section shown by the dashed red line. (Photo date: 21-May-2006)
Piers for the frontage road connection at Interstate 20. (Photo date: 21-May-2006)
Piers for the frontage road connection at Interstate 20. Note the relief sculpture on the sides of the piers. (Photo date: 21-May-2006)
Piers for the frontage road connection at Interstate 20. (Photo date: 21-May-2006)
This is about a mile north of Interstate 20 at Mayfield Road. This view looks south along the future southbound feeder. (Photo date: 21-May-2006)
This view looks north along the future southbound feeder at Mayfield Road. (Photo date: 21-May-2006)
This view looks south along the future northbound feeder at Mayfield Road. (Photo date: 21-May-2006)
The next major crossing going north is Pioneer Parkway. This view looks south along the future southbound feeder at Pioneer Parkway. (Photo date: 21-May-2006)
Same view as above, but zoomed in. (Photo date: 21-May-2006)
This view looks south along the future northbound feeder at Pioneer Parkway. (Photo date: 21-May-2006)
Same view as above, but zoomed in. (Photo date: 21-May-2006)
Looking north at Pioneer Parkway, showing embankment for the future main lanes. North of Pioneer Parkway a two-lane road already existed along the freeway alignment. A project to replace the two-lane road with frontage roads took place from 2006 to 2009. (Photo date: 21-May-2006)