Page last updated or reviewed: June 1, 2015 (review)
The High Five Interchange was completed in November 2005.
Looking west along IH-635 (LBJ Freeway). The eastbound LBJ main lanes will be built in the excavated area on the left.
(Photo date: 18-Feb-2004)
Looking northwest at the ramp that will connect northbound Central Expressway (US 75) to westbound LBJ.
(Photo date: 18-Feb-2004)
Looking north along US 75 (Central Expressway). US 75 traffic snakes its way through the construction zone.
(Photo date: 18-Feb-2004)
Looking east along the LBJ eastbound feeder.
(Photo date: 25-April-2004)
Looking east along the future LBJ eastbound main lanes.
(Photo date: 25-April-2004)
Looking northeast at the ramps in the center of the interchange.
(Photo date: 25-April-2004)
Looking east at the ramps in the center of the interchange.
(Photo date: 25-April-2004)
Looking northeast at the HOV ramp.
(Photo date: 25-April-2004)
Looking north along US 75. This view shows the green color scheme that will be applied to many of the columns. I like the darker green much better than the lime-green that was initially used.
(Photo date: 25-April-2004)
Looking northeast along IH 635. The piers for the IH-635 bridge structure are in place.
(Photo date: 25-April-2004)
Looking southwest at the ramps in the center of the interchange.
(Photo date: 23-May-2004)
Looking southwest at the ramps in the center of the interchange.
(Photo date: 23-May-2004)
Looking west, with piers for the eastbound LBJ main lanes on the right.
(Photo date: 23-May-2004)
Looking west-northwest.
(Photo date: 23-May-2004)
Looking southeast along US 75.
(Photo date: 23-May-2004)
Looking south along US 75.
(Photo date: 23-May-2004)
Looking west along IH-635.
(Photo date: 23-May-2004)